D
Deleted member 88227
Guest
Got almost all my rigs offline for the Summer.
Got another $600+ electric bill and I just can't sustain that throughout the summer. I have my first 4P still rocking though. It's just a 48-core rig and a single 980 Ti in my HTPC running.
I will return for each 3-day sprint where I'll run the rigs for ~4 days to help the team, but as for the marathons I wont be back until the temps lower dramatically.
Sorry guys.
Got another $600+ electric bill and I just can't sustain that throughout the summer. I have my first 4P still rocking though. It's just a 48-core rig and a single 980 Ti in my HTPC running.
I will return for each 3-day sprint where I'll run the rigs for ~4 days to help the team, but as for the marathons I wont be back until the temps lower dramatically.
Sorry guys.